Friday, 2 October 2015

Friday Update.



Well what a fantastic week, weather and work wise.
If only July & August had been this good.

We started some drainage work across the 5th fairway on Monday which was left over from last years winter work programme. Its a diagonal drain which runs from the end of the buggy path to the large hollow on the R/H side of the fairway. It should dry out an area thats sits wet following heavy rain. We have also dug out an area of old path which is no longer used. The drain is finished and marked GUR, but the work on the path will need more work and some turf.

The spoil from the drainage work was moved to the front of the 8th tee to create a base for a winter turf tee. This tee has been finished as well and seeded. Please avoid walking on this area until the seed germinates.
The seed was given to the club to trial by DLF (a seed house). It is a coated seed which should speed up germination and growing in.

We have managed to thin out more areas of rough (R/H 1st, between 6th & 7th, R/H 11th). If the dry weather continues we will carry on with some other areas.

We are still completing a full cut during the week to maintain conditions for as long as possible. 

There have been signs of disease on the greens, but on Tuesday I sprayed a nutrient cocktail to harden the turf against any outbreaks. If this does not work, I'll have to apply a fungicide.

Have a great weekend.

Mark & the Greens team.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.