Another busy week.
The
construction work on the 5th is now completed. The dip has been seeded
and the remaining area will be raked off and seeded early next week. The
small depression on the L/H side has been dug out due to the discovery
of viable land drains running into it. This should turn into a nice
feature thru the year. Pond in winter, wetland during the summer.
The whole area will be G.U.R. for the start of the season. Please take a free drop on the left of the seeded area.
The fairway and semi aeration work is almost complete, with only 2 fairways to finish.
The
greens recieved an application of granular fertiliser on Monday and was
washed in using the irrigation system which was commisioned on the same
day. We don't like using the system this early in the year as it keeps
soil temperatures down. But we needed to break the granules down for
them to be absorbed into the turf.
We have cut many areas of the
course in preparation for the Easter weekend including some alterations
to the 14th fairway. The aim is to move the fairway left to create a
sharper dog-leg.
Next week we hope to install a temporary path to the
Ladies 1st tee. The aim of this is to send all traffic onto the 1st
tees from the R/H side, making the steep path near the starters hut
redundant.
Fingers crossed for a good weekend.
Mark & the Greens team.
No comments:
Post a Comment