Friday, 23 October 2015

Weekend update

Despite a wet Wednesday, its been another good week. The course stood up really well to over 10mm of rain. 

Lots of small but time consuming tasks completed this week.

The range tee is now closed and received a good cut and heavy divot to aid recovery thru the winter. Brian has bought some new mats, so play can continue.
The greens were micro-tined on Monday, the 1st time since early September. This was followed with a cut and iron to restore the surfaces. The Air2G2 was again in use as well to breath life into the greens, The drainage work on the 12th was treated to a top-dressing. The turf is already rooting, so the green will be rested this weekend to help the roots establish.
It was a busy week golf wise, which meant continued set up work to fit in as well.

We have a side-arm flail tractor on hire as well this week. United Utilities are paying for it, so we are tidying the verges and routes thru to the waterworks. This will also involve some treework next week on the track to the 15th tee.
The seed on the 8th tee has germinated well and was top-dressed with sand.
We also placed some stone on the newly formed winter tee on the 6th hole. This was compacted and levelled. more work will be carried out next week.

Fingers crossed for the weekend weather.

Mark & the Greens team.

Saturday, 17 October 2015

The good weather continues and with it the list of completed jobs.

We started using the auger on Monday on the 7th green to aid surface water removal. Over 2 days we managed to bore over 70 holes, each one 4ft deep. The subsoil was very hard due to the dry conditions, which slowed down the process. Each hole was filled with washed 6mm grit and topped off with sand. Following a cut & iron the green was back in play. We also repeated the operation on the front of the 14th green.

Tuesday saw us starting the drainage work on the 12th green. This is a project that has been waiting to be completed for 2 years. Good weather and ground conditions are vital to avoid making a real mess during the digging out process. A total of 80 metres of 80mm perforated drainage pipes was installed in 225 x 800 mm trenches. These trenches were filled with the washed grit and topped off with a sand/soil mix and re-turfed. The turf was then sprayed with an iron/fungicide mix and top-dressed. All the work was completed on Friday morning. The turf will need a few days to settle, so a winter green will be in use into next week.




We have also formed a base for a new winter tee on the 6th hole. This should be ready for play in the next few weeks.

The course was set up for the weekend on friday, but there are signs that things are starting to slow down on the growth front.

Have a great weekend.

Mark & the Greens team.

Friday, 9 October 2015

Friday update


 
Well the Autumn arrived on Tuesday/Wednesday with over an inch of rain falling in a 24 hour period. Certainly tested the drainage.
The greens stood up to it very well with only a couple of puddles on the greens. The Air2G2 really is making a difference.
 
The mild conditions also led to a small but persistent outbreak of Fusarium patch disease. So I applied a systemic fungicide 1st thing on Thursday morning. The chemical will remain active for 4-5 weeks, so fingers crossed it will see us past the disease pressure period.
 
Its been a case of tidying areas throughout the course for the remainder of the week. The fairways and tees have also received a full divot. As in previous week, we have completed a full cut ready for the weekend.
 
We plan to start some deep auger work and drainage work on selected greens next week, but this will be weather dependant. It is a process which has produced good results in previous years.
 
Fingers crossed for a good weekend.
 
Mark & the Greens team.
 

Friday, 2 October 2015

Friday Update.



Well what a fantastic week, weather and work wise.
If only July & August had been this good.

We started some drainage work across the 5th fairway on Monday which was left over from last years winter work programme. Its a diagonal drain which runs from the end of the buggy path to the large hollow on the R/H side of the fairway. It should dry out an area thats sits wet following heavy rain. We have also dug out an area of old path which is no longer used. The drain is finished and marked GUR, but the work on the path will need more work and some turf.

The spoil from the drainage work was moved to the front of the 8th tee to create a base for a winter turf tee. This tee has been finished as well and seeded. Please avoid walking on this area until the seed germinates.
The seed was given to the club to trial by DLF (a seed house). It is a coated seed which should speed up germination and growing in.

We have managed to thin out more areas of rough (R/H 1st, between 6th & 7th, R/H 11th). If the dry weather continues we will carry on with some other areas.

We are still completing a full cut during the week to maintain conditions for as long as possible. 

There have been signs of disease on the greens, but on Tuesday I sprayed a nutrient cocktail to harden the turf against any outbreaks. If this does not work, I'll have to apply a fungicide.

Have a great weekend.

Mark & the Greens team.

Friday, 25 September 2015

Friday Update.

Friday, 18 September 2015

Friday Update.

Hi All,

Another busy week on the course.

We have tried to carry out more thinning of the rough this week, but due to the wet conditions (dew & rain) it has not been possible. The turf has to be really dry for the Amazone to pick the debris up. You can cut it, but it just lies on the surface in clumps. We will try again next week.

The application of top-dressing was postponed on Monday and will now be applied next week. We will again be out with the Air2G2 aerator treating 6 or 7 greens. This has been a regular Monday task throughout this season.

At the moment we are trialling Fairway mowers as ours is coming to the end of its 6th season. We have tried the John Deere and this week the latest machine from Jacobsen. Cutting technology really does advance quickly. 

Due to the good weather, we are still cutting the course as if it was high summer as the grass is still growing strongly.
Tee banks have been cut this week and next week we have another round of bunker maintenance. 

Have a great weekend.

Mark & the Greens team.

Friday, 11 September 2015

Friday Update


A settled week weather wise has allowed us to get stuck into a few outstanding jobs this week.

The greens were sprayed with a nutrient cocktail on Tuesday to continue growth and help keep any disease at bay. The grass cover is excellent following the recent renovation work. The new bent grass seedlings are blending nicely into the putting surfaces.

The dry conditions have allowed us to stone pick in many of the bunkers. I know this is not a permanent solution, but still worthwhile. 
The thick mown rough throughout the course has been scarified heavily using our tractor mounted Amazone unit. This rips out the thick growth and collects it. This process should (over time and repeated operations) reduce the thickness of the grass. The removal of the grass reduces the available nitrogen in the soil from the clippings, following weekly cutting.

We have also managed to spray more areas of Himalayan Balsam throughout the course. This virulent weed will  quickly take over if left unchecked.

A light top-dressing is planned next week to help maintain smooth surfaces.

Have a great weekend.

Mark & the Greens team.